C2Client2Crew

Fox & Ruiz Concrete LLC

Paul Fox · Northville / Milford, MI

DashboardEstimatePhotosChanges

Field

MapTimeWeatherTextsPermitsSafety

Office

SubsInboxHomesReviewsBooksPlansJobsMeasureMaterialsPunchlistSettings

Demo tenant

Fox & Ruiz Concrete LLC

Privacy · Terms

C2Client2Crew

Logged in · Fox & Ruiz Concrete LLC

C2

Client2Crew

Fox & Ruiz Concrete LLC

Paul Fox · Northville / Milford, MI

Demo tenant

Job intake

Northville patio slab

Measure the pour, mark what the client said, and leave a punchlist the crew lead can run.

Room measure

Length, width, and height in feet. Area is the floor. Volume is the room, and cubic yards is the concrete order.

Floor area
320sq ft
Room volume
105.6cu ft
Concrete order
3.91cu yd

Bluetooth laser

Bosch GLM C-series / MeasureOn and Leica DISTO / DISTO Plan. UI only — this build does not open a Bluetooth radio.

No meter linked

Choose a meter, then connect.

Fill dimension

BINGO

Client intake bingo

Tap every word the client actually said. A dot marks the chips that move the estimate: Price, Cash discount, and Quality.

B
I
N
G
O

No price rule yet. Price, Cash discount, and Quality are the chips that move the number.

Quote nudge

  • No price rule yet. Price, Cash discount, and Quality are the chips that move the number.

Client punchlist

Checked items sync live to the crew lead and the field team.

  • Saw-cut joints at 10 ft across the patio

    Open

  • Match the broom finish where the walkway meets the porch

    Done

On this demo the list stays on this device, including after a refresh. The crew lead is looking at the same items.

AI After

Five concrete looks for this job. Generation stays off until a later phase.

  • Patio

    Broom finish, picture-frame border, control joints.

  • Driveway

    Apron, thickened edge, and a clean saw-cut at the garage.

  • Garage floor

    Hard-trowel, sealer, and a slope to the overhead door.

  • Basement

    Level slab, vapor barrier called out, joints held off the walls.

  • Walkway

    Match the existing broom and keep the step rise honest.

Estimate stub

Demo flatwork rate on floor area. Bingo chips for price, cash, and quality rewrite the total.

Demo rate $16.75 / sq ft installed

Working total$5,360.00

Pour is about 3.91 cu yd. This stub prices floor area, not the yard ticket.

Live margin

Profit moves when Price, Cash discount, or Quality is marked. Demo cost is 62% of the takeoff. Price and cash come off the price only. Part of the quality premium is extra cost.

Estimated profit

$2,036.80

Margin

38.0%

Estimated cost $3,323.20 · Working price $5,360.00

  • Price

    Off

  • Cash discount

    Off

  • Quality

    Off

Line items open when you build the estimate. The total already follows the bingo chips.

Pay monthly

The client can pay the lender each month. Fox & Ruiz is paid the full amount up front. This is a stub. No lender is connected.

Change orders on this estimate

Approve or decline from here, or add one the way you would on a phone. Approved amounts sit on the working total above.

Add a change order

Northville patio slab

  • Thickened pad for the grill

    Northville patio slab

    $840.00

    Waiting on client

  • Extra saw-cut joints

    Northville patio slab

    $220.00

    Waiting on client

Client accept

The client taps accept, then a deposit. The card is a stub. Nothing is charged.

A real job deposit is Stripe. It is not an App Store or Google Play purchase.

Privacy · Terms

DashboardEstimatePhotosChanges